You are here: Home » News » Ways to Calculate Crane Capacity

Ways to Calculate Crane Capacity

Views: 0     Author: Site Editor     Publish Time: 2024-01-09      Origin: Site

Normally, we use the crane capacity to determine the amount of load we subject to the crane not to exceed its weight limit. But first, we need to calculate that crane capacity figure. Inaccuracies always result in disasters, such as tipping or collapse, and risks to operators and their crews.  

Accurate calculations allow operators to optimize the performance of cranes for lifting, plan for lifts effectively, and follow industry standards and regulations. Here are ways you may get to solve this puzzle.


red crane



Use Load Weight Method

The load weight method is the easiest way to determine how much a crane can handle. It involves finding the total mass lifted by the crane at any given time against its highest-rated load ability.

The technique necessitates having knowledge of gross weight for a load, which includes all attachments or rigging hardware used. In view of this, you must be aware that various points on the boom have different spans, angles, and layouts; hence, pay attention to not surpassing the rated load capacities of the crane.



Load Radius Method

The load radius is based on two factors: the load weight and the boom length and configuration of the crane. Crane operators and engineers can determine the crane’s capacity at specific radii using load charts provided by crane manufacturers. These charts are available for different boom lengths, jib lengths, counterweights, and configurations for different cranes.

This method is more accurate than determining capacity based on weight as it factorizes in the effect of a change in boom length on the lifting ability of a given crane.

It helps operators understand that as the boom length increases, the crane’s capacity decreases due to the leverage effect. Therefore, it is important to consider calculating its capacity based on a specific load radius to ensure safe lifting operations.



Structural Strength Method

The structural strength method is an approach that examines how strong or weak a type of structure has become towards itself with regard to such issues as geometry, materials, and distribution of loads over it. This approach is often used in special lifting operations where justifying weights or radius methods may need to provide more information.

Detailed calculations involving structural engineers can be carried out to establish its safe lifting capacity alongside ensuring that it does not compromise its structural integrity through connections that could breed any failure.

Stress analysis, material selection, welds, and fatigue life are considered in these computations. The structural strength method is a very useful tool for understanding crane capacity in most situations and conditions of complex lifting.



Stability Method

Safe crane operations cannot be maintained without the stability method. Stability assessment involves determining how stable a crane is when lifting at various boom angles and configurations. Stability calculation refers to the load’s center of gravity, the crane's moment capacity, and the stability of the outriggers or other support systems.

Analysis of limits for stability for cranes prevents cases where accidents are caused by tipping or instability. When doing stability calculations, one normally uses software programmed with information on the crane's specifications, load weight, boom configuration, and environmental factors to be considered.

The crane mustn't exceed its strength limits so that accidents do not occur and people and property remain safe.


Xuzhou BOB-LIFT Construction Machinery Co., Ltd. is a high-tech enterprise specializing in the design, development, manufacture and sales of truck-mounted cranes. With a factory area of over 37,000 square meters, the company's main products include SQ08-SQ55 series of folding and telescopic boom truck-mounted cranes and related variants such as truck mounted crane, marine crane, pickup crane.

QUICK LINKS

PRODUCTS

CONTACT US

 +86 15852499415
Working Hours: 08:30-12:00 GMT + 8
Address: No. 79, Zone B, Jingluotuo Industrial Park, Yunlong District, Xuzhou City, Jiangsu Province 220009, China
Copyright © 2024 Xuzhou BOB-LIFT Construction Machinery Co., Ltd.